We calculated cables on projects:

Al Wakrah Qatar olimpic 2022: 

qatar-3550d65e   article-2582607-1C5E61E400000578-40_964x649

 

 

 

 

 

The project included 24 transformers (1600kVA), 4 Permanent Standby Generators, 4 Temporary Standby Generators and 6 Life Safety Generators, 28 Switchboards, about 350 MCCs, 500 DBs and more than 5000 cables to calculate.

O2 Hotel

AAEAAQAAAAAAAAM6AAAAJGQ2MGQyYmZiLTZjMzktNDdmYS04NWQ2LWY3NWI0N2M4N2Q2Mg

 

 

  • Hotels
  • Stadiums
  • Data centres
  • Industrial
  • Residential

etc.